Raipur, August 27, 2024: The Ministry of Coal has achieved upswing in overall coal production up to August 25, 2024.
The cumulative coal production for the financial year 2024-25, as on 25.08.2024, has significantly increased to 370.67 MT, compared to 346.02 MT during the same period in FY 2023-24, reflecting a growth of 7.12 per cent, Coal Ministry sources said.

Furthermore, the overall coal dispatch has seen a substantial rise, reaching 397.06 MT as on August 25, 2024, for FY 2024-25. This represents a commendable growth rate of 5.48 per cent compared to the previous year’s dispatch of 376.44 MT, they said.

In terms of coal dispatch to the power sector, the cumulative achievement for FY 2024-25, as on August 25, 2024, amounts to 325.97 MT, compared to the corresponding period of the previous year, which was 313.44 MT.
This growth has been achieved despite of huge opening storage of 47 MT at TPPs as on 01.04.24. This ensures a steady supply of coal to meet the energy requirements of the power sector, the officials said.
The overall coal stock position, including Pitheads at mines, TPPs, and in transit, reached 121.57 MT as of August 25, 2024.
This represents a substantial increase of 36.2 per cent compared to the stock of 89.28 MT on the same period of last year.
Additionally, coal stock at TPPs (DCB) as of August 25, 2024, stands at 37.55MT, compared to 29.47 MT last year, indicating a significant growth of about 27.41 per cent.

This higher coal stock position highlights the Ministry of Coal’s commitment to maintaining an ample supply of coal, he officials said.
The continuous growth in production, dispatch, and stock levels underscores the Ministry’s efforts to ensure a reliable energy supply while supporting the nation’s energy security goals, they added.
More Stories
3 Maoists Shot Dead in Chhattisgarh
At least three cadre of the banned organization Communist Party of India (Maoist) were shot dead today in an encounter with the security forces in Sukma district of Chhattisgarh, a top police officer said.
Chief Minister Sai announces installation of a life-size statue of Birsa Munda in Bilaspur city
Chhattisgarh Chief Minister Vishnu Dev Sai today announced the installation of a life-size statue of Bhagwan Birsa Munda in Bilaspur and the naming of a prominent square in the city after him, on his 150th birth anniversary.
PM to visit under-construction Bullet Train Station in Surat
Prime Minister Narendra Modi will visit today the under-construction Bullet Train Station in Surat in Gujarat to review the progress of the Mumbai–Ahmedabad High-Speed Rail Corridor (MAHSR) — one of India’s most ambitious infrastructure projects symbolizing the nation’s leap into the era of high-speed connectivity.
NDA gets three-fourths majority in Bihar Assembly Election
The National Democratic Alliance’s (NDA) swept the Bihar assembly election with the BJP emerging as the single-largest party with 89 seats and the Janata-Dal (United) finishing a close second with 85. Main opposition RJD and Congress have a very dismal performance.
BLOs Reach Nearly 92% of Voters; Distribute Forms for SIR
Under the Special Intensive Revision (SIR) of the Electoral Roll in Chhattisgarh, forms have been distributed to one crore 93 lakh 50 thousand and 843 voters so far, representing approximately 92 per cent of the total number of voters in the state.
Extensive Discussion to Increase Chhattisgarh’s Irrigation Potential; In-Principle Approval for 14 New Irrigation Projects
For increasing Chhattisgarh’s irrigation potential, improving groundwater levels, and strengthening drinking water supply in urban areas Chief Minister Vishnu Dev Sai today held a high level discussion with his ministers and top officials.
